Guides for inspectors: ballooning, first article reports, tolerances and GD&T
These guides explain the paperwork around ballooning a drawing and filling an inspection report, in plain words and with a worked example on a sample part you can open in the tool. They are explanations, not compliance advice: your customer's requirements decide what you must submit.
Start here
- AS9102 explained: what it asks for, the three forms and when it applies: A plain-language explanation of AS9102 first article inspection: what it is, who asks for it, the three forms, what triggers a new inspection, and what we cannot quote. Own words, sources linked.
- Balloon a CAD-exported PDF: SolidWorks, Fusion and other sources: How to balloon a PDF exported from SolidWorks, Fusion 360 or another CAD system for inspection, and why exporting with text keeps auto-detect working.
- First article inspection report example: a complete worked report: A complete worked first article inspection report on a sample part: header, seven characteristics with limits, results and verdicts, every number produced by the tool. Download it as PDF or Excel.
- First article inspection procedure: steps, triggers and partial inspections: A step-by-step first article inspection procedure for a machine shop, when a new inspection is usually needed, and what a delta or partial inspection means. Customer rules come first.
- The Form 3-style inspection report, column by column: A column-by-column walk-through of a Form 3-style characteristic report in our own words: number, location, requirement, result, tooling and nonconformance notes, with a worked example.
- General tolerances in the title block: what applies when a dimension has no tolerance: What tolerance applies when a dimension on a drawing has none: the general tolerance in the title block or the standard it cites. How to read it, worked limits, and how to enter it in a report.
- How to balloon a drawing: a step-by-step method for inspection reports: A step-by-step method for ballooning an engineering drawing so every dimension has a number, a row in the report and a measured result. Worked example on a sample part.
- How to read a CMM report: columns, deviation and out-of-tolerance: What the columns of a coordinate measuring machine report mean: nominal, measured, tolerances, deviation and out of tolerance, with a worked line and the common ways to misread it.
- How to read an engineering drawing as a machinist or inspector: A reading order for an engineering drawing: title block, views, dimensions, tolerances, notes and GD&T, with the sample part as a worked example.
- How to read tolerances on an engineering drawing: How to read plus-minus, unilateral, limit and general tolerances on a drawing, with worked examples from the sample part and how the tool turns each into limits.
- Inspection plan from a drawing: how to build one, and the control plan difference: How to build an inspection plan from a ballooned drawing, and how it differs from a control plan. Own explanation, no standard quoted.
- PPAP dimensional results explained, and how they differ from a first article report: What the dimensional results section of a PPAP package is, how it differs from a first article inspection report, and when a shop produces one or the other.
- PPAP levels and documents: the five submission levels: The five PPAP submission levels, what is submitted and what is retained at each, in our own words, with sources. Not a substitute for the AIAG manual.
- Tolerance stack-up basics: worst case and a worked example: What a tolerance stack-up is, how worst-case analysis adds tolerances, and a worked example with three features. Basics only.
- What is a ballooned drawing? Meaning, purpose and how to make one: A ballooned drawing is an engineering drawing with a numbered circle beside every dimension and note to be inspected. What it is for, who uses it, and a worked example on a sample part.
- What is first article inspection, and when is it asked for?: A plain explanation of first article inspection: what it records, when customers usually ask for it, what the report contains and how ballooning fits in. Our own words, no standard text.
More guides by topic
- Method and meaning: what a ballooned drawing is, how to balloon a drawing, balloon a CAD-exported PDF, auto-ballooning.
- First article and the standard: AS9102 explained, the procedure, a worked report, the three forms.
- Reading a drawing: how to read an engineering drawing, general tolerances in the title block, ISO 2768, stack-up basics, reading a CMM report.
- Plans and approvals: inspection plan or control plan, PPAP levels.
- Reference sets: symbols, glossary, templates, tools.
Reference
The GD&T reference has one page for each of the fourteen characteristics: what it controls, how it is inspected and how to enter it in the report. The Form 3-style template generator makes a blank report as PDF or Excel in your browser.