What is first article inspection, and when is it asked for?
What it is for
Before a supplier makes a full batch, the customer wants evidence that the process can make the part right. The first article is measured completely, not sampled, and the measurements are written down against the drawing. If something is out, it is found while only one part exists.
The report is evidence for the customer. It is not a certification and a file cannot make a part conform; the checking is what counts, and the report records it.
Typical triggers
Customers decide this in their purchase terms, so always read yours. Commonly it is asked for when:
- a part is made for the first time, or by a supplier for the first time;
- the drawing or specification changes in a way that touches the part;
- the process, tooling or location of manufacture changes;
- production stopped for a long period and restarted;
- a nonconformance led to a corrective action that needs proof.
Which of these applies, and how often, comes from the customer. This guide cannot tell you what yours requires.
Three kinds of information
Reports in the common three-part layout record, first, the part and its identity, second, the materials, processes and tests that were used, and third, the characteristic-by-characteristic measurements. This site covers the third part: ballooning the drawing and filling the characteristic table. The Form 3-style report explained walks through the columns.
The table has one row per balloon. Each row says what the drawing requires, what you measured, and what you used to measure it.
A sensible order of work
- Balloon the drawing so every characteristic has a number (method).
- Type or capture the requirement and tolerance for each row.
- Measure the part and enter the result. A numeric result is checked against the limits; an attribute check can be marked pass or fail.
- Note the gauge or instrument used.
- Review every row that is out of tolerance before you issue the report, and raise a nonconformance note for each one.
| No. | Requirement | Min | Max | Result | Verdict |
|---|---|---|---|---|---|
| 1 | 20.0 ±0.2 | 19.8 | 20.2 | 20.08 | IN TOL |
| 2 | 70.0 ±0.3 | 69.7 | 70.3 | 69.91 | IN TOL |
| 3 | ⌀110.0 ±0.1 | 109.9 | 110.1 | 110.04 | IN TOL |
| 4 | ⌀70.0 +0.03/0 | 70.0 | 70.03 | 70.02 | IN TOL |
| 5 | ⌀30.00 +0.02/0 | 30.00 | 30.02 | 30.01 | IN TOL |
| 6 | 4X ⌀9.0 ±0.1 THRU | 8.9 | 9.1 | 9.05 | IN TOL |
| 7 | ⌀90.0 ±0.1 B.C. | 89.9 | 90.1 | 90.03 | IN TOL |
Worked example on the sample part
Take the sample flanged bushing. A first article inspection of it means measuring every characteristic on its drawing on the first part: seven rows, with limits from the printed tolerances. The table below is that record, with demonstration measurements.
| No. | Requirement | Min | Max | Result | Verdict |
|---|---|---|---|---|---|
| 1 | 20.0 ±0.2 | 19.8 | 20.2 | 20.08 | IN TOL |
| 2 | 70.0 ±0.3 | 69.7 | 70.3 | 69.91 | IN TOL |
| 3 | ⌀110.0 ±0.1 | 109.9 | 110.1 | 110.04 | IN TOL |
| 4 | ⌀70.0 +0.03/0 | 70.0 | 70.03 | 70.02 | IN TOL |
| 5 | ⌀30.00 +0.02/0 | 30.00 | 30.02 | 30.01 | IN TOL |
| 6 | 4X ⌀9.0 ±0.1 THRU | 8.9 | 9.1 | 9.05 | IN TOL |
| 7 | ⌀90.0 ±0.1 B.C. | 89.9 | 90.1 | 90.03 | IN TOL |
Common mistakes
- Reporting from a drawing revision that is not the current one.
- Leaving blank cells without a reason; mark a reference dimension as reference rather than leaving it empty.
- Mixing units in one table without saying so.
- Rounding a result so it falls inside the limits. Report what the instrument showed.
FAI, FAIR and first piece: the terms
| Term | Meaning |
|---|---|
| FAI | First article inspection: the inspection itself |
| FAIR | First article inspection report: the record of it |
| First piece inspection | A common term for the same idea, often used in machine shops |
| First off | Shop-floor term for the first part from a set-up |
Are FAI and FAIR the same?
They are closely related but not identical: the FAI is the activity and the FAIR is the report that records it. People use them interchangeably in conversation, which is fine until a purchase order asks for one specifically.
What does a first article inspection include?
Every characteristic on the drawing, measured and recorded; the materials and special processes that went into the part; and the identity of the part, drawing and revision. See the procedure, the checklist and a worked example.
- Is a first article report the same as a certificate of conformance?
- No. A certificate states that the supplier asserts conformance. A first article report shows the measurements behind it, characteristic by characteristic.
- Who decides when I need one?
- Your customer, through the purchase order or quality agreement. This site cannot tell you what yours requires.
- Does the free tool produce a report my customer will accept?
- It produces a report in an AS9102-style Form 3 layout. Whether it meets your customer's format is something you confirm with them.
- What is first article inspection?
- It is a complete check of the first part, or first parts, from a new process, measured against every requirement of the drawing and recorded in a report, to show the process can make conforming parts.
- What does FAIR stand for in manufacturing?
- FAIR stands for first article inspection report, the record of the inspection. FAI is the inspection itself, and the two terms are often used interchangeably.
- Are FAI and FAIR the same?
- Closely related, not identical: the FAI is the activity and the FAIR is the report that records it.