AS9102 forms 1, 2 and 3: what each records, with free blank templates
What each form is for
| Form | What it accounts for | Typical source documents |
|---|---|---|
| Form 1 style | The part and its identity: part number, name, drawing and revision, serial or lot, who made it and why it was inspected | The drawing, the purchase order, the work order |
| Form 2 style | The materials, special processes and functional tests used to make the part, each with its specification and its record | Material certificates, process records, test reports |
| Form 3 style | The characteristics: one row per ballooned dimension or note, with the requirement, the measured result and the tooling | The ballooned drawing and the inspection results |
These descriptions are ours. The standard itself defines the exact fields and instructions and is sold by its publisher. If your customer requires the official layout, use theirs.
Download them
| Template | Excel | |
|---|---|---|
| Form 1-style: part identification sheet | ||
| Form 2-style: materials, processes and tests list | ||
| Form 3-style: characteristic report |
Form 3 is the report the tool builds from a ballooned drawing. The blank Form 1-style and Form 2-style sheets are plain tables to fill in by hand or in Excel. The wording and layout are ours: they follow the arrangement of an accountability form, and nothing from any standard is reproduced.
An order of work
- Start with the drawing: balloon it (how).
- Fill the Form 3-style table from the drawing, then measure and record results.
- Fill the Form 2-style list from your material and process records, one row each.
- Fill the Form 1-style sheet last, once you know the part, revision and lot being reported.
Common mistakes
- Filling the part identity from memory instead of the drawing and purchase order.
- Listing a process without the record that proves it.
- Leaving a result in the characteristics table that does not match its ballooned requirement.
Worked example: the Form 3-style rows for the sample part
The sample drawing has seven balloons, so its Form 3-style table has seven rows. The generated table below shows the requirement, limits, result and verdict for each. Row 6 is the 4X hole callout, row 7 the bolt circle.
| No. | Requirement | Min | Max | Result | Verdict |
|---|---|---|---|---|---|
| 1 | 20.0 ±0.2 | 19.8 | 20.2 | 20.08 | IN TOL |
| 2 | 70.0 ±0.3 | 69.7 | 70.3 | 69.91 | IN TOL |
| 3 | ⌀110.0 ±0.1 | 109.9 | 110.1 | 110.04 | IN TOL |
| 4 | ⌀70.0 +0.03/0 | 70.0 | 70.03 | 70.02 | IN TOL |
| 5 | ⌀30.00 +0.02/0 | 30.00 | 30.02 | 30.01 | IN TOL |
| 6 | 4X ⌀9.0 ±0.1 THRU | 8.9 | 9.1 | 9.05 | IN TOL |
| 7 | ⌀90.0 ±0.1 B.C. | 89.9 | 90.1 | 90.03 | IN TOL |
Field by field: the Form 1-style sheet
| Field | What goes in it |
|---|---|
| Part number and name | As on the drawing's title block |
| Drawing number and revision | From the drawing that the report is for |
| Serial or lot number | The part or lot that was inspected |
| Organisation, supplier or plant code | Who made it |
| Purchase order or contract | The order that asked for the inspection |
| Prepared by and date | The inspector and the day |
| Approved by and date | The reviewer, if your system requires one |
| Reason for inspection | New part, design change, process change or another reason |
Field by field: the Form 2-style list
Each row is one material, process or test the drawing calls for: what it is, the specification it meets, the grade or code, who supplied or performed it, the certificate or record number, and a result or remark. A drawing that calls for a coating, a heat treatment and a material gives three rows. A drawing that calls for none gives a list that says so.
Which source documents you need
For Form 1, the drawing and the purchase order. For Form 2, the material certificate and the process records. For Form 3, the ballooned drawing and the measurement results. Collect them before you start, because the commonest delay is a missing certificate, not a missing measurement.
Mistakes people make
- Filling in the revision from memory and getting it wrong. Copy it from the drawing.
- Leaving a Form 2 row without its certificate number.
- Reporting a characteristic on Form 3 that does not appear on the drawing, or leaving one off.
- Using these blank sheets when the customer has supplied its own.
- Are these the official forms?
- No. They are our own blank sheets in the same arrangement. This site is not affiliated with or endorsed by SAE International.
- Which forms does the tool fill in?
- It builds the Form 3-style report from your ballooned drawing. The other two are blank sheets.
- What is on Form 1 of an AS9102 report?
- In our own words, Form 1 accounts for the part: part number, name, drawing and revision, serial or lot, who made it and why it was inspected. The official form is sold with the standard, and our blank Form 1-style sheet is a free approximation.
- What is on Form 2?
- Form 2 accounts for the materials, special processes and functional tests used to make the part, each with its specification and its record. Our blank Form 2-style sheet has a numbered table for them.
- Do I need all three forms?
- Not always. Some customers ask for all three, some specify their own layout, and some ask for part of the set. The customer's request decides, so check the purchase order before building the package.