PPAP levels and documents: the five submission levels

Last reviewed 19 November 2026 · Written by Paul, who also builds and supports the tool

PPAP, the production part approval process, has five submission levels that decide what a supplier sends and what it keeps on file. Level 1 sends the warrant only, level 2 adds samples and limited data, level 3 adds samples and complete data and is generally treated as the default, level 4 follows the customer's own list, and level 5 keeps the complete data at the supplier for review on site.
Detail A · Levels

Table

Level Submitted Retained
1 Part submission warrant, plus an appearance report where relevant Everything else
2 Warrant with product samples and limited supporting data The rest of the data
3 Warrant with samples and complete supporting data Records
4 Warrant and other items the customer defines The rest
5 Warrant with samples Complete data, reviewed at the supplier's site

Sources describe all the elements as completed at every level; the level changes only what is sent or reviewed. The authority is the AIAG manual and your customer's requirements. These levels come from secondary sources, not the manual.

Detail B · Where the ballooned drawing fits

Dimensional results

Dimensional results are one PPAP element. A ballooned drawing and a table of results is a common way to present them. See PPAP dimensional results compared with FAI.

Common mistakes

  • Assuming level 3 when the customer asked for another.
  • Submitting less than the level requires.

The eighteen elements

PPAP is organised around a list of elements, such as design records, process flow, control plan, measurement system analysis, dimensional results, material and performance test results, initial process studies and the part submission warrant. Sources describe all of them as completed at every level, with the level deciding which are submitted and which are kept. The exact list and definitions are in the AIAG manual.

Who asks for it

PPAP is common in automotive supply chains and in other industries that adopted it. If a customer sends a PPAP request, it names the level; if it does not, ask. A common assumption is level 3, but do not rely on it.

Dimensional results in a PPAP

One element is a table of dimensional results for the parts submitted, with the specification, the measured values and an assessment for each. A ballooned drawing is the usual way to tie each result to a feature. How many parts are measured is stated by the customer. See FAI and PPAP compared.

What this tool covers

The tool builds the characteristic table with limits and verdicts. It does not produce the warrant, the control plan or any other PPAP element.

Mistakes to avoid

  • Assuming the level.
  • Submitting a table for a different drawing revision.
  • Treating a summary page as the manual.

Worked example: what level 3 means for the sample part

Suppose the sample bushing is ordered under PPAP at level 3, the level most sources describe as the default when the customer does not state one. You would submit the part submission warrant, product samples and the complete supporting data. The dimensional element would be the seven-row table below, for the number of parts the customer specifies. At level 5 you would submit the warrant and samples and keep the table and other data at your site, ready for the customer to review there.

Report rows for the sample drawing
No.RequirementMinMaxResultVerdict
120.0 ±0.219.820.220.08IN TOL
270.0 ±0.369.770.369.91IN TOL
3⌀110.0 ±0.1109.9110.1110.04IN TOL
4⌀70.0 +0.03/070.070.0370.02IN TOL
5⌀30.00 +0.02/030.0030.0230.01IN TOL
64X ⌀9.0 ±0.1 THRU8.99.19.05IN TOL
7⌀90.0 ±0.1 B.C.89.990.190.03IN TOL

Table: rows produced by the tool for the sample drawing. The measured results are made-up demo values.

The documents, in plain words

Element What it is
Design records The drawing and any design documents
Process flow The steps from material to finished part
Control plan How each characteristic is controlled in production
Measurement system analysis Evidence that the gauges are good enough
Dimensional results The table of measured values against the drawing
Material and performance tests Results of any required tests
Initial process studies Capability data from the process
Part submission warrant The summary document signed by the supplier

The full list and the exact definitions are in the AIAG manual. This table is a plain-language orientation only.

Which level will I be asked for?

The customer names it in the request, and some customers set different levels for different parts. If it is not stated, ask. Treat any statement that level 3 is the default as a common assumption, not a rule.

Mistakes people make

  • Submitting to the wrong level because it was assumed.
  • Missing that the retained documents must still exist and be current.
  • Treating PPAP as a one-off: a process change can require a new submission.
What are the PPAP levels?
Five, summarised above.
What are the PPAP levels?
Five: level 1 warrant only, level 2 warrant with samples and limited data, level 3 warrant with samples and complete data, level 4 warrant and other items as the customer defines, level 5 warrant with samples and complete data reviewed at the supplier's site.
Which PPAP level is the default?
Sources commonly describe level 3 as the default when the customer does not specify, but this is a convention. The customer's request decides, so confirm it.
What documents are in a PPAP?
Typically design records, process flow, a control plan, measurement system analysis, dimensional results, material and performance test results, process studies and the part submission warrant, among others in the AIAG list.
Where do dimensional results fit in a PPAP?
They are one element: a table of measured values for the specified number of parts, tied to a ballooned drawing. See the FAI and PPAP comparison page.

Open a drawing — free

Sources

Related

Do not scale drawingThird-angle projectionSheet 1 of 1balloonmydrawing.com
Built and supported by Paul: [email protected]. AS9102 is a standard of SAE International; this site is not affiliated with or endorsed by SAE. Nothing here reproduces the standard. Explanations are our own and are not legal or compliance advice.Privacy · Terms · Refunds