First article inspection procedure: steps, triggers and partial inspections

Last reviewed 19 November 2026 · Written by Paul, who also builds and supports the tool

A first article inspection procedure is: get the controlled drawing and the purchase terms, balloon every characteristic, make the first part from the intended process, measure every ballooned characteristic, record the results, check materials and processes, and have the report reviewed before the part ships. This page explains each step and when a new inspection is usually triggered.
Detail A · The procedure

Steps

  1. Confirm the requirement. Read the purchase order for the standard, the revision and any customer form.
  2. Balloon the drawing. One number per characteristic (how).
  3. Make the part from the real process, with the tools and programme you will use in production.
  4. Measure every characteristic, and record the result, the tool and who measured.
  5. Record materials, processes and tests the drawing calls for, with their certificates.
  6. Review: every balloon has a result, every out-of-tolerance result has a note.
  7. Issue to the customer in the form they require, and keep a copy.
Detail B · When another inspection is needed

Triggers (customer rules decide)

Change Usually needs
New part number Full inspection
Drawing change affecting a characteristic Inspection of the affected characteristics, or full
New source, process, tooling or location Full or partial, as the customer decides
Production stopped for a long time Customer-defined; the period is set in their terms

These are common-practice summaries from public supplier guidance. If a time limit or rule is attributed to AS9102, confirm it in a licensed copy; we do not quote it.

What is a delta or partial FAI?

A delta or partial first article inspection re-inspects only the characteristics affected by a change, and reuses the earlier report for the rest. Example: a hole position tolerance is tightened on a new drawing revision, so only that characteristic and anything it affects are measured again.

Detail C · Worked row

One row, start to finish

Report rows for the sample drawing
No.RequirementMinMaxResultVerdict
120.0 ±0.219.820.220.08IN TOL
270.0 ±0.369.770.369.91IN TOL
3⌀110.0 ±0.1109.9110.1110.04IN TOL
4⌀70.0 +0.03/070.070.0370.02IN TOL
5⌀30.00 +0.02/030.0030.0230.01IN TOL
64X ⌀9.0 ±0.1 THRU8.99.19.05IN TOL
7⌀90.0 ±0.1 B.C.89.990.190.03IN TOL

Table: rows produced by the tool for the sample drawing. The measured results are made-up demo values.

Row 4 is a diameter of 70.0 with a tolerance of plus 0.03. The inspector reads 70.02, which is inside 70.0 to 70.03, and records the instrument used.

Common mistakes

  • Measuring a prototype instead of the production process.
  • Doing the inspection and then changing the process.
  • Closing the report with an unexplained out-of-tolerance row.

Worked example: the sample part through the procedure

Step 1: the purchase order names a customer report layout and a drawing revision. Step 2: the drawing is ballooned, giving seven balloons. Step 3: the first part is machined with the production programme. Step 4: all seven characteristics are measured and recorded, which produces the table below. Step 5: material and process records are attached. Step 6: a reviewer checks that seven rows match seven balloons and that no result is outside its limits. Step 7: the package is issued.

Report rows for the sample drawing
No.RequirementMinMaxResultVerdict
120.0 ±0.219.820.220.08IN TOL
270.0 ±0.369.770.369.91IN TOL
3⌀110.0 ±0.1109.9110.1110.04IN TOL
4⌀70.0 +0.03/070.070.0370.02IN TOL
5⌀30.00 +0.02/030.0030.0230.01IN TOL
64X ⌀9.0 ±0.1 THRU8.99.19.05IN TOL
7⌀90.0 ±0.1 B.C.89.990.190.03IN TOL

Table: rows produced by the tool for the sample drawing. The measured results are made-up demo values.

If row 4 had read 70.04 instead of 70.02, it would sit 0.01 above the upper limit of 70.03. The report would carry a nonconformance reference, the part would be held, and a disposition would be recorded before anything shipped.

Records to keep

Keep the ballooned drawing, the signed report, the instrument identifiers and calibration dates, the material and process certificates and any nonconformance records. Keep them together and tied to the drawing revision, because they are what you will be asked for if the customer audits the job.

Who does what

The person who ballooned the drawing is best placed to measure it, because they have read every requirement. A second person reviewing the package catches errors the first person cannot see. In a small shop these may be the same person on different days. The point is a fresh read, not a hierarchy.

When the procedure goes wrong

A characteristic cannot be measured with the tools to hand: stop and get the right instrument rather than estimate. The drawing is unclear: ask the drawing owner and record the answer. A result is out of tolerance: record it honestly and follow your nonconformance process, because a report that hides a failure is worse than one that reports it.

Mistakes people make

  • Treating the first part as a formality and not measuring it with the production process.
  • Re-measuring until a result fits. Record the first honest reading and note any re-measurement.
  • Missing a characteristic because it appears only in a note or on a second sheet.
Who decides if a partial inspection is enough?
Your customer.
How many parts are measured?
The customer states it. We do not assume a number.
What are the steps of a first article inspection?
Confirm the requirement, balloon the drawing, make the part with the production process, measure and record every characteristic, record materials and processes, review, and issue. Each step has a record: the drawing, the table, the certificates and the signed report.
When is a new first article inspection required?
Commonly for a new part, a drawing change affecting a characteristic, a change of source, process, tooling or location, or a long production gap. The exact triggers and time limits are set by the customer or the standard and should be checked there.
What is a partial or delta FAI?
A partial or delta first article inspection re-inspects only the characteristics affected by a change and reuses the earlier report for the rest. Your customer decides whether a change qualifies.
How many parts are measured in a first article inspection?
The customer states it. Some ask for one part, some for several, and PPAP dimensional results typically specify a sample size. Do not assume a number: read the order.

Open a drawing — free

Sources

Related

Do not scale drawingThird-angle projectionSheet 1 of 1balloonmydrawing.com
Built and supported by Paul: [email protected]. AS9102 is a standard of SAE International; this site is not affiliated with or endorsed by SAE. Nothing here reproduces the standard. Explanations are our own and are not legal or compliance advice.Privacy · Terms · Refunds