Steps
- Confirm the requirement. Read the purchase order for the standard, the revision and any customer form.
- Balloon the drawing. One number per characteristic (how).
- Make the part from the real process, with the tools and programme you will use in production.
- Measure every characteristic, and record the result, the tool and who measured.
- Record materials, processes and tests the drawing calls for, with their certificates.
- Review: every balloon has a result, every out-of-tolerance result has a note.
- Issue to the customer in the form they require, and keep a copy.
Triggers (customer rules decide)
| Change | Usually needs |
|---|---|
| New part number | Full inspection |
| Drawing change affecting a characteristic | Inspection of the affected characteristics, or full |
| New source, process, tooling or location | Full or partial, as the customer decides |
| Production stopped for a long time | Customer-defined; the period is set in their terms |
These are common-practice summaries from public supplier guidance. If a time limit or rule is attributed to AS9102, confirm it in a licensed copy; we do not quote it.
What is a delta or partial FAI?
A delta or partial first article inspection re-inspects only the characteristics affected by a change, and reuses the earlier report for the rest. Example: a hole position tolerance is tightened on a new drawing revision, so only that characteristic and anything it affects are measured again.
One row, start to finish
| No. | Requirement | Min | Max | Result | Verdict |
|---|---|---|---|---|---|
| 1 | 20.0 ±0.2 | 19.8 | 20.2 | 20.08 | IN TOL |
| 2 | 70.0 ±0.3 | 69.7 | 70.3 | 69.91 | IN TOL |
| 3 | ⌀110.0 ±0.1 | 109.9 | 110.1 | 110.04 | IN TOL |
| 4 | ⌀70.0 +0.03/0 | 70.0 | 70.03 | 70.02 | IN TOL |
| 5 | ⌀30.00 +0.02/0 | 30.00 | 30.02 | 30.01 | IN TOL |
| 6 | 4X ⌀9.0 ±0.1 THRU | 8.9 | 9.1 | 9.05 | IN TOL |
| 7 | ⌀90.0 ±0.1 B.C. | 89.9 | 90.1 | 90.03 | IN TOL |
Row 4 is a diameter of 70.0 with a tolerance of plus 0.03. The inspector reads 70.02, which is inside 70.0 to 70.03, and records the instrument used.
Common mistakes
- Measuring a prototype instead of the production process.
- Doing the inspection and then changing the process.
- Closing the report with an unexplained out-of-tolerance row.
Worked example: the sample part through the procedure
Step 1: the purchase order names a customer report layout and a drawing revision. Step 2: the drawing is ballooned, giving seven balloons. Step 3: the first part is machined with the production programme. Step 4: all seven characteristics are measured and recorded, which produces the table below. Step 5: material and process records are attached. Step 6: a reviewer checks that seven rows match seven balloons and that no result is outside its limits. Step 7: the package is issued.
| No. | Requirement | Min | Max | Result | Verdict |
|---|---|---|---|---|---|
| 1 | 20.0 ±0.2 | 19.8 | 20.2 | 20.08 | IN TOL |
| 2 | 70.0 ±0.3 | 69.7 | 70.3 | 69.91 | IN TOL |
| 3 | ⌀110.0 ±0.1 | 109.9 | 110.1 | 110.04 | IN TOL |
| 4 | ⌀70.0 +0.03/0 | 70.0 | 70.03 | 70.02 | IN TOL |
| 5 | ⌀30.00 +0.02/0 | 30.00 | 30.02 | 30.01 | IN TOL |
| 6 | 4X ⌀9.0 ±0.1 THRU | 8.9 | 9.1 | 9.05 | IN TOL |
| 7 | ⌀90.0 ±0.1 B.C. | 89.9 | 90.1 | 90.03 | IN TOL |
If row 4 had read 70.04 instead of 70.02, it would sit 0.01 above the upper limit of 70.03. The report would carry a nonconformance reference, the part would be held, and a disposition would be recorded before anything shipped.
Records to keep
Keep the ballooned drawing, the signed report, the instrument identifiers and calibration dates, the material and process certificates and any nonconformance records. Keep them together and tied to the drawing revision, because they are what you will be asked for if the customer audits the job.
Who does what
The person who ballooned the drawing is best placed to measure it, because they have read every requirement. A second person reviewing the package catches errors the first person cannot see. In a small shop these may be the same person on different days. The point is a fresh read, not a hierarchy.
When the procedure goes wrong
A characteristic cannot be measured with the tools to hand: stop and get the right instrument rather than estimate. The drawing is unclear: ask the drawing owner and record the answer. A result is out of tolerance: record it honestly and follow your nonconformance process, because a report that hides a failure is worse than one that reports it.
Mistakes people make
- Treating the first part as a formality and not measuring it with the production process.
- Re-measuring until a result fits. Record the first honest reading and note any re-measurement.
- Missing a characteristic because it appears only in a note or on a second sheet.
- Who decides if a partial inspection is enough?
- Your customer.
- How many parts are measured?
- The customer states it. We do not assume a number.
- What are the steps of a first article inspection?
- Confirm the requirement, balloon the drawing, make the part with the production process, measure and record every characteristic, record materials and processes, review, and issue. Each step has a record: the drawing, the table, the certificates and the signed report.
- When is a new first article inspection required?
- Commonly for a new part, a drawing change affecting a characteristic, a change of source, process, tooling or location, or a long production gap. The exact triggers and time limits are set by the customer or the standard and should be checked there.
- What is a partial or delta FAI?
- A partial or delta first article inspection re-inspects only the characteristics affected by a change and reuses the earlier report for the rest. Your customer decides whether a change qualifies.
- How many parts are measured in a first article inspection?
- The customer states it. Some ask for one part, some for several, and PPAP dimensional results typically specify a sample size. Do not assume a number: read the order.
Sources
- Supplier guidance for first article inspection (Northrop Grumman): https://cdn.northropgrumman.com/-/media/Supplier-Documents/Quality-Documents/Q1-4-24-DSF.pdf (read 2026-11-19)
- What is AS9102 First Article Inspection? (AS9100 Store): https://as9100store.com/aerospace-standards-explained/what-is-as9102-first-article-inspection/ (read 2026-11-19)
Related
- What is first article inspection, and when is it asked for?
- AS9102 explained: what it asks for, the three forms and when it applies
- How to balloon a drawing: a step-by-step method for inspection reports
- First article inspection report example: a complete worked report
- First article inspection checklist: three stages, printable
- Open the tool and try it on a drawing