AS9102 explained: what it asks for, the three forms and when it applies

Last reviewed 19 November 2026 · Written by Paul, who also builds and supports the tool

AS9102 is the aerospace standard for first article inspection, published by SAE International for the IAQG. It describes how to prove, with a documented report, that a production process can make a part that meets every requirement of its drawing, and it organises that report into three forms. The standard is sold by SAE; this page explains the ideas in our own words and does not reproduce it.
Detail A · What it is, and who asks for it

The short version

First article inspection (FAI) is a full check of the first part, or the first parts, from a new process. AS9102 sets out the content of the record. Aerospace and defence customers commonly flow it down to suppliers in the purchase order or quality clauses, which is why a machine shop meets it: the customer names it, not the shop. Sources describe it as guidance that is made binding by the customer's contract and by the quality system the customer requires, so what you owe is whatever your purchase order says.

Detail B · The three forms

What the report is made of

Form Records Where to read more
1 Part number accountability: the part, its drawing and revision, and who made it Forms 1, 2 and 3 explained
2 Product accountability: materials, special processes and functional tests Forms 1, 2 and 3 explained
3 Characteristic accountability: every dimension and note, its requirement and its measured result Form 3-style layout

A report does not always need every form, and some customers specify their own layout. Follow the customer.

Detail C · When a new inspection is needed

Triggers, as practice commonly describes them

Public guidance from suppliers and consultants lists the same families of trigger: a new part, a change to the design, a change of source, process, tooling, material or location, and a long gap in production. How long a gap, and whether a change needs a full or a partial inspection, differs by customer. We do not state a number as fact because the exact wording is in the standard and in your contract. See the procedure guide.

Where this tool fits

The tool balloons the drawing and builds a Form 3-style report. It does not fill Forms 1 and 2 for you, does not certify anything, and is not endorsed by SAE International.

FLANGED BUSHING - SAMPLE PARTDRAWN FOR balloonmydrawing.com SHEET 1 OF 1 MMSECTION A-AFRONT VIEW20.0 ±0.270.0 ±0.3⌀110.0 ±0.1⌀70.0 +0.03/0⌀30.00 +0.02/04X ⌀9.0 ±0.1 THRU⌀90.0 ±0.1 B.C.1234567
Figure 1. The characteristics part of a report, built from a ballooned sample drawing.

Common mistakes

  • Citing the standard for a rule you have only read about in a blog post.
  • Using an old copy of the standard when the customer names a revision.
  • Treating the tool's report as an approved record. Your quality system decides that.

How a machine shop meets it in practice

For most small shops the work is straightforward: balloon the drawing, measure every characteristic once on the first part, record the results, collect the material and process certificates, and send the package in the layout the customer names. Where shops struggle is not the measuring but the paperwork: missing certificates, a drawing revision that does not match the report, and results that are not traceable to a numbered characteristic.

What you can safely say to a customer

You can say your report is laid out in the arrangement of a three-form first article report, that every characteristic is numbered and traced to the drawing, and that the results are your own measurements. You should not say that a tool or a file has been approved or accredited by anyone. Whether the report satisfies the customer is for the customer to decide.

How it connects to quality management

Quality management standards for aerospace require suppliers to verify that their production process can make conforming parts. First article inspection is one common way to show it. Sources differ on the clause numbers and wording, so cite the document your customer names.

Revisions of the standard

The standard has been revised over time, and the details of what changed between revisions are in the standard itself. We could not find a public page that sets out the changes in a form we could cite, so we do not summarise them here. Check revision details against the buyer's copy of the standard and the revision named in the purchase order, because that is the version the buyer will apply. This site makes no claim that its report follows any particular revision.

Worked example: what the report for the sample part holds

For the sample flanged bushing, the characteristics part has seven rows, one per balloon, as in the table below. A complete package would add the part identity sheet and a list of any materials and processes the drawing calls for. The sample drawing calls for none that we model, so those sheets are blank templates here.

Report rows for the sample drawing
No.RequirementMinMaxResultVerdict
120.0 ±0.219.820.220.08IN TOL
270.0 ±0.369.770.369.91IN TOL
3⌀110.0 ±0.1109.9110.1110.04IN TOL
4⌀70.0 +0.03/070.070.0370.02IN TOL
5⌀30.00 +0.02/030.0030.0230.01IN TOL
64X ⌀9.0 ±0.1 THRU8.99.19.05IN TOL
7⌀90.0 ±0.1 B.C.89.990.190.03IN TOL

Table: rows produced by the tool for the sample drawing. The measured results are made-up demo values.

How the three parts are usually produced

  1. Make the ballooned drawing once.
  2. Build the characteristics table from it.
  3. Gather the material and process records.
  4. Fill in the identity sheet last, when the lot and revision are known.
  5. Review the package as a whole: every number on the drawing is a row, every row has a result and every record is on file.
Is AS9102 a law?
No. It becomes a requirement when a customer or quality system makes it one.
Do I have to use the official forms?
Often yes if the customer says so. Ask what they accept.
Is a ballooned drawing required?
See what is a ballooned drawing.
What is AS9102 used for?
It sets out how to document a first article inspection: a record that a production process can make a part that meets its drawing. Aerospace customers commonly require it from suppliers, and it organises the record into three forms.
Is AS9102 mandatory?
Not by itself. It becomes a requirement when a customer or a quality system calls for it, usually in a purchase order or quality clause. What you owe is whatever your order says.
Where do I get the official AS9102 forms?
From the publisher of the standard, SAE International, or from your customer if they supply their own. Our blank templates follow the same arrangement but are not the official forms and are not endorsed by SAE International.

Open a drawing — free

Sources

Related

Do not scale drawingThird-angle projectionSheet 1 of 1balloonmydrawing.com
Built and supported by Paul: [email protected]. AS9102 is a standard of SAE International; this site is not affiliated with or endorsed by SAE. Nothing here reproduces the standard. Explanations are our own and are not legal or compliance advice.Privacy · Terms · Refunds