Common symbols
| Symbol | Meaning | More |
|---|---|---|
| Ø | Diameter | |
| R | Radius | |
| Boxed value | Basic dimension | basic dimension |
| (value) | Reference dimension | reference dimension |
| ⌴ ⌵ ↧ | Counterbore, countersink, depth | hole callouts |
| Frame with symbol | Geometric tolerance | feature control frame |
| Letter in a box | Datum feature | datums |
| Check mark with lines | Surface finish | surface finish |
Threads
A thread callout such as M10 x 1.5 gives the nominal diameter and pitch; the tolerance class follows after a dash. Check the thread with the gauge your customer names.
What gets a balloon
A symbol that carries a requirement gets a balloon: a hole, a tolerance, a thread, a finish. Notes and datum labels do not unless they carry a requirement.
Common mistakes
- Mixing up a reference dimension and a tolerance.
- Missing a thread callout in a note.
Symbols you will see in feature control frames
The fourteen geometric characteristic symbols (straightness, flatness, circularity, cylindricity, profile of a line, profile of a surface, parallelism, perpendicularity, angularity, position, concentricity, symmetry, circular runout and total runout) are shown on the GD&T chart with a page for each. The material condition modifiers M and L are explained on their own page.
Dimension symbols
A diameter sign marks a circular feature or a cylindrical tolerance zone. R marks a radius. A square sign marks a square feature. A box around a number marks a basic dimension. An arc over a number marks an arc length. A slash through a dimension marks it as not to scale on older drawings.
Section and view marks
Capital letters with arrows show where a section is cut and which way it is viewed. A circle with a letter marks a detail view. These do not carry requirements, but they tell you where to find a dimension.
Weld and finish symbols
Welding symbols have their own standard and are outside what this site covers. Surface finish symbols are explained on their page.
How to use this page
Treat it as a quick lookup. Where a symbol is not covered, find its meaning in the drafting standard the drawing cites rather than guessing, because a wrong reading changes how the part is checked.
Worked example on the sample part
The sample drawing uses four symbols you will meet constantly. The diameter sign appears on five of its seven balloons: the 110.0 diameter (balloon 3), the 70.0 and 30.00 diameters (balloons 4 and 5), and the 9.0 holes and 90.0 bolt circle (balloons 6 and 7). The plus-minus tolerance sign gives the symmetric limits on balloons 1, 2, 3, 6 and 7. The unilateral form, plus 0.03 over zero, appears on balloons 4 and 5. The quantity prefix 4X appears on balloon 6. Each of these changes how the report row is filled, and the generated table shows all of them.
| No. | Requirement | Min | Max | Result | Verdict |
|---|---|---|---|---|---|
| 1 | 20.0 ±0.2 | 19.8 | 20.2 | 20.08 | IN TOL |
| 2 | 70.0 ±0.3 | 69.7 | 70.3 | 69.91 | IN TOL |
| 3 | ⌀110.0 ±0.1 | 109.9 | 110.1 | 110.04 | IN TOL |
| 4 | ⌀70.0 +0.03/0 | 70.0 | 70.03 | 70.02 | IN TOL |
| 5 | ⌀30.00 +0.02/0 | 30.00 | 30.02 | 30.01 | IN TOL |
| 6 | 4X ⌀9.0 ±0.1 THRU | 8.9 | 9.1 | 9.05 | IN TOL |
| 7 | ⌀90.0 ±0.1 B.C. | 89.9 | 90.1 | 90.03 | IN TOL |
How symbols combine
A single callout often stacks several: a quantity, a diameter sign, a size, a tolerance and an instruction. Read them in order and write down what each asks you to measure. If a callout includes a feature control frame, read it separately as its own characteristic: see how to read a feature control frame.
Common marks beyond the table
| Mark | Meaning | Where covered |
|---|---|---|
| Triangle on a surface | Datum feature symbol, often with a letter in a box | Datums |
| Circle with a letter on a leader | Detail view marker | This page |
| Arrow with a letter | Section view marker | This page |
| Wavy leader or break line | The part is shown shortened | This page |
| Arrowhead dimension line | The extent of a dimension | This page |
| Diameter with a slash | Diameter | Table above |
| Underlined number | Not to scale on older drawings | Check the drawing's notes |
Mistakes inspectors make
- Taking a dimension from a detail view and missing that its scale differs from the full view.
- Reading a section view's hatching as part of a dimension.
- Missing the underline that marks a value as not to scale and then scaling from the drawing.
- Treating a datum triangle as a weld or finish mark.
- Where do I find the GD&T symbols?
- See the chart.
- What do the symbols on an engineering drawing mean?
- They are shorthand for sizes, shapes, tolerances and instructions: a slashed circle is a diameter, R is a radius, a box marks a basic dimension and a framed symbol is a geometric tolerance. The table on this page lists the common ones with links.
- How do I read a section view?
- A section view shows the part as if cut along a marked line, with hatching on the cut material. Find the cutting-plane arrows on another view, read the letter, and use the dimensions on the section for features inside.
- Where do I find GD&T symbols?
- The fourteen geometric characteristic symbols are charted on the GD&T page, each with its own page on meaning, inspection and entry in a report.