Datums in GD&T: what they are, how they are labelled and how to read them

Last reviewed 19 November 2026 · Written by Paul, who also builds and supports the tool

A datum is a theoretically exact point, axis or plane that measurements are taken from. It is established by a real surface of the part, the datum feature, labelled with a letter in a box on the drawing. A feature control frame lists datums in order, and the order says which one constrains the part first.
Detail A · Basics

Datum, datum feature, order

  • The datum feature is the real surface or feature, marked with a letter such as A.
  • The datum is the exact reference derived from it.
  • The primary datum is listed first and is touched first, usually by the largest or most stable surface.
  • The secondary and tertiary follow.
Detail B · Example

A bracket

A: the large flat face, primary. B: a long edge, secondary. C: a short edge, tertiary. A position frame "A, B, C" locates a hole from the face and then from the two edges. Changing the order to "B, A, C" would change how the part is held and so the measurement.

Common mistakes

  • Measuring from the wrong surface because the order was ignored.
  • Treating a datum letter as a dimension.

Datum targets and simulation, briefly

Real surfaces are not perfect, so the datum is not the surface itself. It is an exact plane or axis that the surface is held against: in practice the surface touches the high points of a fixture, a surface plate or the jaws of a vice. This is why inspectors talk about "simulating" a datum, and why two people who hold the same part differently can get different results. When the drawing gives datum targets (specific points, lines or small areas on a surface), only those spots are used to establish the datum, which makes the set-up repeatable.

What the inspector records

For a feature controlled from datums, the report row carries the full frame text, for example the position symbol, the tolerance and the letters, so the reviewer can see what the result was measured against. Record how the part was held in the notes if your system asks for it. If the drawing does not make the datum clear, ask before you measure, because a wrong set-up cannot be repaired afterwards.

A short checklist

  1. Find every datum letter on the drawing and the surface it labels.
  2. Note the order in each frame that uses them.
  3. Choose a set-up that touches the primary datum first.
  4. Record the result against the full frame.

Worked example: a hole pattern located from datums

The bundled sample has no datums, so this example is invented. A flat plate has a hole pattern located by a position frame reading 0.30 with datum references A, B and C. A is the large face, B an edge, C a second edge at right angles. The inspector places the plate with face A on a surface plate, pushes edge B against a fixed stop and edge C against a second stop. Coordinates are then read from that origin. If the datum order in the frame were B, A, C, the plate would be held on the edge first and the readings would differ.

Datum Surface Constrains
A, primary Large face Tilt and height: three points of contact
B, secondary Long edge Rotation and one direction: two points
C, tertiary Short edge The last direction: one point

Datum feature symbols

A datum feature is marked with a box holding the letter, joined to the surface by a triangle, either on the surface's outline or on its extension line. For a datum from a feature of size, such as a hole, the triangle sits on the dimension line. Read the symbol's position carefully: it decides whether the datum is the surface or the axis of the feature.

Mistakes inspectors make

  • Holding the part on the wrong surface first.
  • Measuring from the part's edge instead of from the datum plane.
  • Ignoring that a datum of a hole is its axis, not its surface.
  • Reading datum letters in alphabetical order rather than the order the frame lists them.
What is a datum in GD&T?
An exact reference taken from a real feature, labelled with a letter.
What is a datum feature?
A datum feature is the real surface or feature on a part, labelled with a letter in a box, from which a datum is derived. The datum itself is the exact reference taken from it.
What does the order of datums mean?
The first datum listed is the primary, touched first and constraining the most freedom. The second and third follow. The order in the frame is the order of set-up, and changing it changes the measurement.

Open a drawing — free

Related

Do not scale drawingThird-angle projectionSheet 1 of 1balloonmydrawing.com
Built and supported by Paul: [email protected]. AS9102 is a standard of SAE International; this site is not affiliated with or endorsed by SAE. Nothing here reproduces the standard. Explanations are our own and are not legal or compliance advice.Privacy · Terms · Refunds