First article inspection checklist: three stages, printable

Last reviewed 19 November 2026 · Written by Paul, who also builds and supports the tool

This first article inspection checklist has three stages: before you measure, while you measure, and before you issue the report. Tick each line, then print the page or copy the table.
Detail A · The checklist

Three stages

Stage Check Done
Before The controlled drawing and its revision are in hand [ ]
Before The purchase order's FAI requirements are read [ ]
Before The drawing is ballooned and every characteristic has one number [ ]
Before Gauges and instruments are in calibration [ ]
During The part comes from the intended production process [ ]
During Every ballooned characteristic has a measured result [ ]
During Tooling used is recorded against each row [ ]
During Materials, processes and tests are recorded with their certificates [ ]
After Every out-of-tolerance result has a note and a disposition [ ]
After Balloon numbers on the drawing match the report rows [ ]
After Part, drawing and revision identity match on every sheet [ ]
After The report is reviewed by a second person where your system requires [ ]
Detail B · Make it

Use with the tool

Balloon the drawing in the tool, fill the results, and export the report. The blank templates give the part identity and materials sheets.

TemplatePDFExcel
Form 1-style: part identification sheet
Form 2-style: materials, processes and tests list
Form 3-style: characteristic report

Generated in your browser by the same exporter the tool uses. Nothing is uploaded.

Common mistakes

  • Ticking a line from memory.
  • Skipping the calibration check.

How to use it on a real job

Print one copy per part number and keep it with the report. Tick the lines as you complete them rather than at the end, and write the date and your initials against the stage. If a line does not apply, write N/A rather than leaving it blank, so a reviewer can tell it was considered.

Why three stages

Most missed items in a first article inspection are not measurement errors but set-up errors made before measurement or paperwork gaps left after it: a drawing of the wrong revision, an instrument out of calibration, an out-of-tolerance result with no note. The checklist puts those where they would be caught.

Adapting it

Add lines for anything your customer asks for, for example a packing check, a certificate of conformance or a photograph of the part. Keep the lines short and checkable: "photograph attached" can be ticked, "good quality" cannot.

Worked example: applying the checklist to the sample part

Take the sample flanged bushing. Before measuring, you confirm the drawing and revision, read the purchase order, and balloon the drawing: seven balloons. You check that the micrometer, bore gauge and caliper you plan to use are in calibration. During measurement you record seven results and the instrument against each. The 4X hole callout needs four readings, so you either record four results against balloon 6 or split it into 6.1 to 6.4. After measurement you check that every row has a verdict, that nothing is out of tolerance without a note, and that the balloon numbers on the print match the table.

FLANGED BUSHING - SAMPLE PARTDRAWN FOR balloonmydrawing.com SHEET 1 OF 1 MMSECTION A-AFRONT VIEW20.0 ±0.270.0 ±0.3⌀110.0 ±0.1⌀70.0 +0.03/0⌀30.00 +0.02/04X ⌀9.0 ±0.1 THRU⌀90.0 ±0.1 B.C.1234567
Figure 1. The ballooned sample drawing: seven balloons, each to be ticked off.

Stage by stage notes

Before. Most delays start here. A drawing of the wrong revision, a purchase order requirement you did not read, and an instrument past its calibration date all cost a rework later.

During. Measure on the production process, not a prototype. Record each result as it is read, with the instrument, so a reviewer can trace it. Record the materials and processes as you go, with the certificate numbers.

After. The review is the last chance to catch a missing row. Compare the count of balloons on the drawing with the count of rows in the table. They should match, apart from any sub-numbers.

Printing it

Use the browser's print function on this page and choose landscape if the table wraps. The tick boxes print as empty squares. If you prefer a spreadsheet, copy the table: it pastes cleanly into Excel.

Mistakes people make

  • Ticking from memory at the end of the job rather than as each item is done.
  • Ignoring N/A: a line that does not apply should say so, not stay blank.
  • Using one checklist for different customers without checking their extra requirements.
Is this an official checklist?
No. It is our own, based on common practice. Your customer's checklist comes first.
What should a first article inspection checklist include?
Items before measuring, such as the drawing revision, the order requirements, ballooning and instrument calibration; items during measuring, such as results, tooling and certificates; and items after, such as notes for out-of-tolerance rows and a review of the report.
Is there an official first article inspection checklist?
Customers publish their own, and some standards describe what a report must contain, but this one is our own, based on common practice. Where your customer supplies a checklist, use theirs.
Can I print the checklist?
Yes. Print the page from your browser, in landscape if needed. The tick boxes print as empty squares, and the table also pastes into Excel if you prefer a spreadsheet.